Post-tensioning & precast
Fewer columns. More space.
Just as safe.
Emblema Las Cascadas San Salvador
The specialty that made the region's towers possible: post-tensioned concrete with a Post-Tensioning Institute–certified crew.
170,000+ m² of post-tensioning installed
Services
- Post-tensioning
- 170,000+ m² installed, a PTI-certified crew: slimmer slabs and longer spans. More open spaces, parking structures with greater capacity.
- Precast
- Plant-fabricated elements: less on-site labor—the key bottleneck in El Salvador's construction market—and the capacity to run several projects in parallel.
Applied in Art Haus Emblema Las Cascadas Torre Aria